|
|
|
|
Home > Computers & Programming > Help For Beginners > Buying a new PC > Azhar Ahmed
|
|
|
Azhar Ahmed
|
|
|
This expert is temporarily unavailable, but expects to resume service on
. We apologize for any inconvenience caused.
|
|
|
Expert in:
Buying a new PC
|
Rating:
(Read all 1 reviews)
|
|
Languages:
English
|
|
Manufacturing Engineering: Manaufacturing Plant / Systems / Equipment / Process Design, Modification and Upgrades. Specialization in Painting Systems, Sheet-Metal & Plastic Products.Computers- hardware, software and networking pertaining to manufacturing operations.
|
|
|
|
|
|
|
|
|
|
|
Degrees
|
|
Doctorate Studies in Manufacturing Strategy - Logistics
Masters in Advanced Manufacturing
Post Graduate Certificate in Power Plant Technologies
Certification in Computer Programming in Visual Basic, C++ & Java.
|
|
|
My Expert Service
|
Strong back ground in project management in the automotive industry
Researched projects, defined needs, developed project plans, located resources, proposed budgets and schedules, prepared bid packages, obtained estimates and confirmed tenders
Headed solutions engineering teams for customer support and competitive bidding for new projects
Team player with strong leadership and communications skills both written and verbal
Extensive experience in dealing with customers, staff, management and contractors at all levels
Specialization in factory automation and materials handling systems, equipment and processes
Fully conversant in software covering areas of engineering, planning, maintenance, simulation and machine control, Microsoft Solutions Frame Work, MSDN
Certified programmer in C, C++, Visual C ++, Visual Basic and Java
|
|
|
Experience & Qualifications
|
Employment Profile:
PakLand Cement Ltd. Deputy Manager HOU-Cell Project Management-Cement Mill Installation
DaimlerChrysler, USA Paint Automation Specialist Auto-Assembly Facilities Automation Support
Ford Canada Facilities Engineer Auto-Engine Casting Facilities Modifications
Johnson Controls Ltd. Engineering Manager Auto-Seats Assembly Engineering Management
Azcon Tech. Services Technical Consultant Manufacturing Systems Design & Development
Chrysler Canada Project Engineer-Paint Auto-Assembly Plant Modifications-Launch
ParPak Canada Ltd. Production Coordinator Production Control Systems - Thermoforming
Al-Kuhaimi Metal Indus. Manager R & D Design & Development–Engineered Doors
British Aerospace Research Fellow Aircraft Manufacture Facilities Improvements
Fauji Fertilizer Company Engineer-III Mechanical Maintenance- Plant Turn-arounds
Achievements:
Planned & Managed Model Year Changeover shut downs for Chrysler’s 98 LH Product Launch using MS Project leading to an over all reduction of down time from the proposed 10 weeks to 3 weeks and savings in excess of $50 million USD
Identified bottle necks and implemented modifications in the E-Coat/Phosphate skid cleaning, primer coat and oven systems that contributed to increase in quality and change over from two to three shift production
Headed a Cross Functional Team, as Environmental Management Representative, that led to ISO14001 Certification, making Milton Assembly Plant the first plant to achieve this honour in Johnson Controls
Utilized IBM RS 6000 based financial reporting system to report progress of on-going projects clearing a three-year back log that satisfied contractors that were being paid on time
Developed a fully automated paint line capable of primer-paint and top-coat 400 door panels in a 8 hour shift resulting in a 5 fold increase in thru put and quality
Developed a system of products exceeding ISO A120 rating for doors and panels utilized in Saudi Strategic Storage Programme resulting in a secure contract for the organization
Developed software in Basic/Excel for blast load calculations, deflection analysis and spring selections resulting in compliance to industry standards and increased sales
Advised on design, installation and upgrades for a Mini-Van Conversion Plant, Mineral Water Bottling Plant and Tempered Glass Cook Ware factory
Implemented a production planning and control system based on CMS software running on the IBM AS400 System with particular focus on reporting production efficiency and material variance control resulting in increased labour efficiency control and limiting material variance within 5%
|
|
|
Available Modes Of Communication
|
|
email/chat
|
|
|
Most Recent Client Reviews
(Read all 1 reviews)
|
|
by
shi7lf
on
Apr 29 2005
|
|
wasting time with him with out any result
|
|
|
(Read all 1 reviews)
|
|
|
Contact
Azhar Ahmed
|
|
|
|
|
|
|