|
|
|
|
Home > Computers & Programming > Applications > SAP > prashant kawale
|
|
|
prashant kawale
|
|
|
This expert is currently unavailable for sessions. We apologize for any inconvenience caused.
|
|
|
Expert in:
SAP
|
Rating:
|
|
Languages:
English
|
|
Sap ps consultant. I have completed 1 full cycle implementation, one functionality upgradation & doing implementation of ps in Govt org in India
|
|
|
|
|
|
|
|
|
|
|
Degrees
|
|
Diploma in electronics & telecom
|
|
|
My Expert Service
|
SAP PS - Consultant Knowledge of SAP PS with all other processes like Investment management, Material Management Basic functional knowledge of other modules as Material Management, Plant Maintenance 1 full-cycle implementations – Project planning through post go-live support & 1 Functionality Upgradation Project. Presently working on ONGC SAP implementation project
|
|
|
Experience & Qualifications
|
Customer ONGC Ltd
Duration From April 26, 2004 to till date – SAP R/3 4.6C
Industry Oil & Gas Project Description Implementation of SAP R/3 Version 4.6C, One of the Largest SAP implementation in Asia with more than 8000 user licenses, 17 company codes.
Role PS Consultant
Responsibilities/Deliverables
-Scope of Solution – Project System, Period End Closing, Investment Management
- Responsible for Configuration of the system for diff. types of project like drilling, work over, engineering services, survey etc.
–Responsible for end user training delivery
–Responsible for Roll out at diff. locations
–Ensured PS integration between IM, MM, CO and FI
–Created the Base Line Testing/integration test plan for PS & IM
–Responsible for end user support at roll out sites.
------------------------------------------------------------Customer Mahindra & Mahindra- IT Section
Duration 2 Months from March 2004 to April 2004 – SAP R/3 4.6B
Industry Manufacturing – Auto & Farm equipments
Project Description Capturing of Revenue Cost of Projects through PS Module (Functionality Upgradation)
Role Consultant – PS Module
Responsibilities/
Deliverables
–Scope of Solutions: Project System, Period End closing, Summarisation reports development based on diff. scenarios.
–Responsible for Configuration of the System
–Responsible for End User Training Manual preparation, Configuration document Preparation
–Designed the R/3 solution for capturing the revenue cost of the project through Project System Module (Functionality upgradation)
–Ensured PS integration between MM, CO and FI
–Created the Base Line Testing/integration test plan for PS.
-------------------------------------------------------
Organisation Ispat Industries Ltd
Duration 1 Year 5 Months, From Sept 2002 to Feb. 2004, SAP R/3 4.6C
Industry Manufacturing, Steel
Project Description SAP 4.6C implementation
Role Core Team Member – Project System
Responsibilities/
Deliverables
–Completion of conceptual design (AS-IS Process and TO-BE process mapping for PS Module ,Testing, GAP analysis and resolution, solution through Customized development.
–Configuration support.
–Development of test scenarios & documentation.
–Documentation for BBP
–Documentation of Finalized ocesses and conducting workshops for the finalized processes
–ASAP Implementation Methodology
–End User Training
–End User Training Manual Preparation
–Go Live Support
|
|
|
Available Modes Of Communication
|
|
email/chat
|
|
|
|
|
Contact
prashant kawale
|
|
|
|
|
|
|